Loading…
Demo
← All demos
Reset
✕
Contractor name and branding hidden for privacy. All data is fictional.
Vantage Turnaround
Calder Bay · Weller Parish
Olefins Unit
▾
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Log activity
MV
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Locations
Calder Bay · Weller Parish
Olefins Unit
← Wallchart
Asset type
PSV / PSE Pull
5 in scope · 3 complete ·
0 open RRs
Export CSV
Log activity
All
In progress
Repair
Complete
Pending
Text: compact
5 of 5 items · click a cell to edit, drag a column edge to resize
EQ. #
Description
Progress
Unit
Status
Set Pressure (psig)
Shop Ticket #
RR
Comments
PSV-1102A
Quench Tower Overhead Relief
complete
OLE
Shop tested, reset, reinstalled.
285
SV-40118
·
Popped 3 psi high, re-set.
PSV-1102B
Quench Tower Overhead Relief (spare)
complete
OLE
Shop tested, reinstalled.
285
SV-40119
·
·
PSV-1145
Caustic Wash Drum Relief
complete
OLE
Shop tested, reinstalled.
150
SV-40126
·
Seat lapped.
PSV-1180
Propylene Receiver Relief
In progress
OLE
In the valve shop.
320
SV-40131
·
Waiting on a bellows.
PSV-1206
Fuel Gas KO Drum Relief
pending
OLE
Not pulled.
125
·
·
·