Loading…
Demo
← All demos
Reset
✕
Contractor name and branding hidden for privacy. All data is fictional.
Vantage Turnaround
Calder Bay · Sabine Terminal
Tank Farm B
▾
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Log activity
MV
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Locations
Calder Bay · Sabine Terminal
Tank Farm B
Rolling log
Every inspection logged, dated, and attributed — the second sheet, kept in sync automatically.
Export CSV
Log activity
Filter:
All status
Complete
In progress
RR / repair
All shifts
Days
Nights
Last 24 hours
Last 7 days
Last month
All
All equipment
TK-221
TK-224
TK-226
TK-230
6 of 6
Date
Shift
Inspector
Asset type
Equip / (PKG/WL) #
Inspection details
RR
IWR complete
8/11/26
Days
Ray Thibodeaux
TANKS
TK-226
Patch plate installed and vacuum box tested. RR closed out.
TKF-RR 001
RT 08/11
8/7/26
Nights
Curtis Haney
TANKS
TK-230
Nozzle N4 pad weld undersized against the drawing. RR written.
TKF-RR 002
CH 08/07
7/30/26
Days
Ray Thibodeaux
TANKS
TK-226
Underside pitting near the sump. RR written for a patch plate.
TKF-RR 001
RT 07/30
7/22/26
Nights
Sonia Barrera
TANKS
TK-224
Floor scan complete, no indications.
—
SB 07/22
7/17/26
Days
Wes Duplantis
TANKS
TK-221
Floor MFL scan clean. Tank released.
—
WD 07/17
7/14/26
Days
Wes Duplantis
TANKS
TK-221
Internal visual complete.
—
WD 07/14