Contractor name and branding hidden for privacy. All data is fictional.
Vantage Turnaround
Calder Bay · Sabine Terminal
Tank Farm B
▾
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Log activity
MV
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Locations
Calder Bay · Sabine Terminal
Tank Farm B
RR Log
Global chronological numbering — RR # order is written order, numbers are never reused.
Export CSV
Log activity
Total
2
Filtering
Awaiting review
1
Filtering
Approved
1
Filtering
Deferred
0
Filtering
Closed
0
Filtering
Filter:
Last 24 hours
Last 7 days
Last month
All
All asset types
TANKS
All equipment
TK-226
TK-230
All causes
Mechanical damage
Corrosion
Erosion
Cracking
Other
Not tagged
2 of 2 - numbers never reused
RR #
Equipment
Asset type
Finding
EWO #
Written by
Written
Status
TKF-RR 001
TK-226
TANKS
Underside floor pitting near the sump. Recommend a 10 ft by 10 ft patch plate over the affected area.
—
Ray Thibodeaux
7/30/26
approved
TKF-RR 002
TK-230
TANKS
Nozzle N4 reinforcing pad weld is undersized against the original drawing. Recommend re-welding to the specified leg size.
—
Curtis Haney
8/7/26
review